Crystal Bridges North Elevator Tower
A new entrance that allows better access to and from the popular north lawn and walking trails is just one of the many changes made during this museum project. It also includes a new 68-foot copper clad elevator tower, a 100-foot pedestrian bridge, and a new entrance vestibule.
Details
Location
Bentonville, AR
Size
600 SF
Completion
June 2017
Owner
Crystal Bridges Museum of American Art
Architect
Safdie Architects, Hight-Jackson Associates P.A.
Role
Prime Contractor
Delivery Method
CM - At Risk