ACC Onsite Utilities and CHW Distribution System
ACC On-Site Utilities Upgrade Project is part of the new facilities at Highland Mall Campus. This project includes 2 phases, the installation of wastewater piping, new stormwater piping and distribution, new water lines and distribution, new electrical duct-banks, and communication duct-banks. In addition to the above Flintco Industrial is self-performing the excavation and installation and backfill of a welded carbon steel pipe.
Details
Location
Austin, TX
Cost
$12,198,300
Owner
Austin Community College
Architect
Stantec -- Walker Engineering
Role
Prime Contractor
Delivery Method
General Contracting