Broken Arrow Public Schools Indoor Practice Facility & Track Complex

This 43,688 SF, new metal building is an addition for Broken Arrow Public Schools. The exterior finish includes cast stone, EIFS, metal panels, glass and split face block. The steel structure sits upon a spread footings foundation with a standing seam metal roof. For the track complex, a primary use is a new turf football field for the marching band to practice on, with a track surrounding the field. Outside the track surface there are areas for shot put, long jump, high jump and discuss track activities. The complex also includes a ticket booth, press box and bleacher all to be used for track meets.

Details

Location

Broken Arrow, OK

Cost

$5,384,521

Size

43,688 SF

Completion

February 2015

Owner

Broken Arrow Public Schools

Architect

Gregory S. Helms Architect

Role

Prime Contractor

Delivery Method

CM - At Risk