Claremore High School STEM Building

The new two-story, 25,000 SF STEM Building addition for the high school is adjacent to the middle school. It features 12 STEM classrooms that include a robotics lab and shop, multi-media/AV lab, laboratory/bio-med classrooms, think tank spaces, administrative offices, and support spaces. The entry atrium and adjacent “makers space” has a 25’ high ceiling and will be used as an event and demonstration space. The building will become the new main entrance for the high school and will be a beacon for the high school. The exterior features a multi-colored brick pattern on half the building and multi-colored aluminum composite panels on the other half.

Details

Location

Tulsa, OK

Cost

$8,253,000

Size

25,000 SF

Completion

July 2021

Owner

Claremore Public Schools

Architect

GH2 Architects

Role

Prime Contractor

Delivery Method

CM - At Risk