Gentry Public Schools Intermediate School
Two phases of demolition cleared the way for a new two-story intermediate school built with a 3,000-SF safe room. The first demolition included a 26,000 SF structure built in the 70s. The second demolition eliminated six buildings built in the 50s, which totaled 19,000 SF.
Details
Location
Gentry, AR
Cost
$9,000,000
Size
47,500 SF
Completion
December 2018
Owner
Gentry Public Schools
Architect
Hight-Jackson Associates P.A.
Role
Prime Contractor
Delivery Method
CM - At Risk