INTEGRIS Baptist Medical Center 6th Floor West Renovations
The 6th-floor care unit of this hospital, consisting of patient rooms and rehabilitative gym areas, remained open and operational during both phases of this renovation project. With the exception of the two gyms, this was the first renovation since 2000.
Details
Location
Oklahoma City, OK
Cost
$ 1,112,163
Size
15,000 SF
Completion
January 2013
Owner
Integris Healthcare System
Architect
HKS, Inc.
Role
Prime Contractor
Delivery Method
CM - At Risk