UT Sid Richardson Hall (SRH) HVAC Renovation

HVAC improvements impacted the flow of air conditioning to one museum and three levels of archives, so temporary temperature/humidity control was required. Our work included demolition/replacement of air handler units and water pumps, removal/replacement of steam equipment, removal of an obsolete control center, and a tie-in to a new electrical panel.

Details

Location

Austin, TX

Cost

$2.873.214

Size

1.400 SF

Completion

August 2017

Owner

University of Texas at Austin

Architect

Tom Green & Company Engineers Inc.

Role

Prime Contractor

Delivery Method

General Contracting